Road Work Announced for Route 110 in Stratford and Shelton
August 28, 2020Installation of Centerline Rumble Strips in on Route 110 in Stratford and Shelton, Thursday night September 3 & Tuesday night September 8
The following information was provided by the Connecticut Department of Transportation:
CT DOT is announcing night work for the installation of centerline rumble strips on Route 110 in Stratford and Shelton.
The project consists of the installation of centerline rumble strips for 3.91 miles on Route 110 in Stratford and Shelton. Rumble strips are a proven safety countermeasure and will minimize the number of lane departure crashes. The rumble strips will alert drivers through noise and vibration should their vehicle veer off into an opposing lane of traffic. This project is scheduled to occur on Thursday night, September 3, 2020 and Tuesday night September 8, 2020.
No work will occur from 5:00 a.m. on Friday, September 4, 2020 through 7:30 p.m. on Tuesday, September 8, 2020
LANE CLOSURE INFO
Motorists can expect lane closures on Route 110 in Stratford from Route 113 to 575 feet south of the Route 15 Northbound ramps and Route 110 in Stratford and Shelton from 250 feet south of Pine Tree Trail in Stratford to Rocky Rest Road in Shelton.
This work will be performed utilizing a moving operation with intermittent closures of lanes to complete the work. Please use caution around this operation as these vehicles will be moving slower than posted speeds and when possible move over to provide them a buffer lane during work activity. The regular work schedule for this project is 8:00 p.m. to 5:00 a.m. Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.