The project involves milling bridge decks, repairs to exposed bridge decks and paving a section of I-95 between the New England Avenue overpass  (near Exit 24) and the Wordin Avenue overpass (near Exit 26) for a total distance of 2.3 miles. The contractor will then reverse direction proceeding southbound on Interstate 95 all within this construction season.

There will be milling and paving of on-ramps and off-ramps and repair of existing concrete bridge decks. Detour routes will be provided should ramps need to be closed for construction activities.

LANE CLOSURE INFO:

The following ramps are scheduled to be closed:

Week of 6/19/2017 –

  •  I-95 NB On-Ramp 25 will be detoured to NB 26 On-Ramp
  •  I-95 NB Off-Ramp 25 will be detoured to SB 25 Off-Ramp
  •  I-95 NB On-Ramp 26 will be detoured to NB 25 On-Ramp
  •  I-95 NB Off-Ramp 26 will be detoured to SB 26 Off-Ramp
  •  I-95 SB Off-Ramp 25 will be detoured to SB 24 Off-Ramp
  •  I-95 SB On-Ramp 25 will be detoured to SB 24 On-Ramp
  •  I-95 SB Off-Ramp 26 will be detoured to SB 25 Off-Ramp
  •  I-95 SB On-Ramp 26 will be detoured to SB 27 On-Ramp

Week of 6/26/2017 –

  •  I-95 SB Off-Ramp 25 will be detoured to SB 24 Off-Ramp
  •  I-95 SB On-Ramp 25 will be detoured to SB 24 On-Ramp
  •  I-95 SB Off-Ramp 26 will be detoured to SB 25 Off-Ramp
  •  I-95 SB On-Ramp 26 will be detoured to SB 27 On-Ramp